Friday, May 9, 2008

CNNC Final Boards




Process Work and Some Final Stuff.. Having Trouble with the Rest of the Final JPGS


Final Reception Desk
Final Reception Desk
Final Signage
Interim Model
Interim Boards

Interim Boards


Interim Models of 3 Spaces


Process Work: Reception sketch models and sketchy materials presentation

Wednesday, March 19, 2008

Final CNNC Boards

Board Composition
Floor Plan
Elevation looking from inside toward North wall
Elevation looking from inside toward South wall

Final CNNC Perspectives

Function Hall with mobile stage, seating, and dining, located on Aycock St. side of building in smaller vaulted space. Large kitchen, additional storage space, computer lab, and small conference room located behind stage.

Left side of Reception Area with glass wall showcasing Function Hall. Seating and refreshments are pictured here, reception desk would be on the right side of Reception Area. Doors to public bathrooms are also represented here.

Reception Area leads into the Office Area. Here is one set of "Office Suites" with a smaller, private meeting area behind it.

Staff Lounge/Copy and Mail room: Dining tables are in the foreground then a lounge area with sofas, and beyond that a large closet and the Mail/Copy room. Looking the other way the kitchenette and staff bathrooms would be seen.

Tuesday, March 18, 2008

Process Work: Preliminary Perspectives

Auditorium
Office Suites
Auditorium
Staff Lounge

Monday, March 17, 2008

Thursday, February 28, 2008

CNNC Process Work

east-west elevation 1/16" scale
north-south elevation 1/8" scale
1st solid floor plan 1/16" scale
Sketchy floor plan using movable pieces for experimentation